Machine Performance
Equipment telemetry per production step tied to the Andon floor: OEE, cycle-time spread by station, line rate trend, downtime Pareto, and the line's recent Andon events — all on one screen.
L1Bottling Line 1RUNNING
94%
OEE
OEE = Availability × Performance × Quality 99% × 96% × 99%
Availability
99%
Performance
96%
Quality
99%
Availability from 1 h downtime over a 72 h window · Performance vs 222 u/min nominal · Quality from reject signal
Cycle time by step
TargetMeanMedianp95
1+45% vs target
L1 Filler
filler
T
95
267 ms946 ms
Mean 392 Median 369 p95 682 Target 270n = 90
2+8% vs target
L1 Capper
capper
T
95
160 ms857 ms
Mean 291 Median 270 p95 479 Target 270n = 90
3+1% vs target
L1 Labeler
labeler
T
95
174 ms653 ms
Mean 274 Median 259 p95 464 Target 270n = 90
4-2% vs target
L1 Inspector
inspector
T
95
175 ms733 ms
Mean 265 Median 254 p95 365 Target 270n = 90
5+11% vs target
L1 Case Packer
case packer
T
95
200 ms629 ms
Mean 300 Median 278 p95 538 Target 270n = 90
Line rate trend
units / min91u/min · latestnominal 222
Jun 26, 07:00 PMJun 29, 06:00 PM
Downtime Pareto
total 59m 24sCap feed empty25m 58s43.7%
Label jam18m 27s74.8%
Sensor fault14m 59s100%
80%
Andon events on L1
infostate changeResolved
L1 IDLE ->RUNNING
Jun 28, 07:00 AM · 2d ago · resolved in 13m 0s