This is a live demo on synthetic data. It logs activity (which features you use, and timing) to help Fobech improve it.

Machine Performance

Equipment telemetry per production step tied to the Andon floor: OEE, cycle-time spread by station, line rate trend, downtime Pareto, and the line's recent Andon events — all on one screen.

L1Bottling Line 1RUNNING
Nominal 222 u/minAvg rate 213 u/minWindow 72 h
94%
OEE
OEE = Availability × Performance × Quality 99% × 96% × 99%
Availability
99%
Performance
96%
Quality
99%
Availability from 1 h downtime over a 72 h window · Performance vs 222 u/min nominal · Quality from reject signal

Cycle time by step

TargetMeanMedianp95
1
L1 Filler
filler
+45% vs target
T
95
267 ms946 ms
Mean 392 Median 369 p95 682 Target 270n = 90
2
L1 Capper
capper
+8% vs target
T
95
160 ms857 ms
Mean 291 Median 270 p95 479 Target 270n = 90
3
L1 Labeler
labeler
+1% vs target
T
95
174 ms653 ms
Mean 274 Median 259 p95 464 Target 270n = 90
4
L1 Inspector
inspector
-2% vs target
T
95
175 ms733 ms
Mean 265 Median 254 p95 365 Target 270n = 90
5
L1 Case Packer
case packer
+11% vs target
T
95
200 ms629 ms
Mean 300 Median 278 p95 538 Target 270n = 90

Line rate trend

units / min
91u/min · latestnominal 222
Jun 26, 07:00 PMJun 29, 06:00 PM

Downtime Pareto

total 59m 24s
Cap feed empty25m 58s43.7%
Label jam18m 27s74.8%
Sensor fault14m 59s100%
80%

Andon events on L1

infostate changeResolved
L1 IDLE ->RUNNING
Jun 28, 07:00 AM · 2d ago · resolved in 13m 0s